Garayalde Gas Compression Plant
Our project consisted of surveying the existing facilities for the later erection and assembly of three gas compression packages (separators, coalescing filter, coolers, drainage tanks, oil tanks, scrubbers, SDV, etc), and its warehouse including a 3TN crane bridge, having delivered the complete detailed engineering, civil concrete bases, isometrics, HAZOP and Stress mechanical analysis under ASTM A53/A106/API 5L standards, electrical and instrumentation detailed engineering, startup procedures and its complete wiring and erection on site.
Guanaco Campo. Southern Argentina
The work consisted of surveying the existing facilities for the later erection of a Vaporization Skid, which would be integrated into the field facilities, the Guanaco Campo is a gas compression Plant with two compressors, separation, liquids drainage and a flare for burning residual gases.
In order to assembly this equipment to the installation, it was necessary the rearrangement of gas lines, venting lines, drainages lines, electrical supply, control and instrumentation lines.
Piping documentation was delivered with component´s lists, supports, list of supports, skid design, a new perimeter fence, general lighting design, and instruments erection and connection procedures.
Gas and Oil Treatment Plant, San Diego, YPF. Southern Argentina
This project consisted of surveying existing facilities and based on this first assessment, determine the consequences of a complete Shut Down of the Plant, either related to an operational need or an unexpected reason (equipment failure or issues with the electricity supply system). Based on the findings of the study of both type of shutdowns, a series of proposals were made, divided into a) improvements of the existing facilities and, b) recommendations made in case the unexpected event occurs and minimize the impact of the GSD on the plant. This last one can have consequences of significant magnitude, such as fire in the facilities and its spread through the surrounding field, adding a greater inventory to the event.
Zappalorto Thermal Power Plant. Buenos Aires Argentina.
This Thermal Power Plant is located in Buenos Aires consisting having 4 turbines of 28MW each with a total power delivery of 112MW, assembled by the company APR Energy and generating for ENRE-CAMMESA-EDENOR, the work carried out by our company consisted on the execution of the detailed engineering of the Natural Gas Processing plant consisting in a bridge regulation, two measurement bridges, gas filtration and drying equipment, Civil engineering concrete bases for the different equipment, lighting columns, sidewalks, property perimeter fence, etc. We were handled the complete mechanical and piping engineering solution, for connecting the different equipment with the turbo generators, electrical engineering, instrumentation and communications Shelter.
Gran Chaco Gasification Plant, Yacuiba, Bolivia
The Gran Chaco Gasification Plant was built in order to extract the liquids from natural gas wells, to later be exported to Argentina and Brazil, the liquids separation allowed Bolivia to obtain gasoline, liquefied petroleum gas for supplying the local market.
We were handled the total electrical and instrumentation engineering for the plant, the total design of the Medium and Low Voltage system including electrical boards, materials computation, on field assistance, commissioning, pre-commissioning and start up procedures of the Gasification Plant
Chubut Norte Wind Farm. Southern Argentina
This project consisted of the execution of the detailed engineering of the main power substation Medium / High Voltage (100MVA) which included: Civil, electrical and Mechanical conceptual and detailed engineering. In this project we were also handled the complete erection of the civil buildings, concrete bases for equipment and many electrical works such as the grounding network in accordance with IEEE80 and the power transformer’s erection.
Civil and Structural Engineering
New secondary oil recovery plant Alba I– Deep Mybrug. | YPF SA | Chubut-Argentina
We provided detailed design, procurement and commissioning for a new secondary oil recovery plant including civil, electrical, and piping detailed engineering as well as equipment erection procedures.
Rules, standards and regulations applied:
- IRAM
- ISA S5.1
- SRT900/2015
New secondary oil recovery plant Las Mesetas 2 | YPF SA | Santa Cruz-Argentina
We provided detailed design, procurement and commissioning for a new secondary oil recovery plant including civil, electrical, and piping detailed engineering as well as equipment erection procedures.
Rules, standards and regulations applied:
- IRAM
- Cirsoc
- API 620
- API 650
- IEC, DIN, NEC, IEEE
- ISA S5.1
- SRT900/2015
Water Injection Plant Design PTC / PTA | Tecpetrol | El Tordillo – Chubut- Argentina
We provided detailed design, procurement and commissioning for a new water injection plant including civil, electrical, instrumentation, and piping detailed engineering as well as equipment erection procedures.
Rules, standards and regulations applied:
- IRAM
- Cirsoc
- IEC, DIN, NEC
- ISA S5.1
- SRT900/2015
Wemco Erection– Southern plant | ENAP Sipetrol | La Guitarrita – Chubut – Argentina
Our main task was to design a new biphasic separator due to the increasing deterioration suffered by the actual separator. We were asked to deliver detailed engineering for the civil works to be made as wel as the electrical, instrumentation an piping works and erection procedures.
Rules, standards and regulations applied:
- ASME B31.3
- Cirsoc
- IEC, DIN, NEC
- ISA S5.1
- SRT900/2015
Loop Contraste Agar | Pan American Energy-BP | Cuenca Golfo San Jorge – Tres Picos
The Project consisted on executing detailed engineering for Crude Oil Storage Tanks including, civil, and piping works, as well as electrical and instrumentation works and erection procedures.
Rules, standards and regulations applied:
- ASME B31.3
- Cirsoc
- IEC, DIN, NEC
- ISA S5.1
Chubut Norte Wind Farm. Southern Argentina
This project consisted of the execution of the detailed engineering of the main power substation Medium / High Voltage (100MVA) which included: Civil, electrical and Mechanical conceptual and detailed engineering. In this project we were also handled the complete erection of the civil buildings, concrete bases for equipment and many electrical works such as the grounding network in accordance with IEEE80 and the power transformer’s erection.
Electrical and Instrumentation Engineering
Electrical Shut Down – San Diego Plant. | YPF SA | Manantiales Behr´s Oilfield –Chubut - Argentina
The Service consisted on surveying existing electrical facilities in order to determine the consequences they could suffer in an eventual general shutdown, storage availability, and response times in case of an eventuality.
Rules, standards and regulations applied:
- Electrical Works: IEEE,IRAM, IEC, DIN, AEA 90365, ISA S5.1
Crude Oil Plant lighting. | YPF SA | Manantiales Behr – Chubut
In order to attend safety rules requirements we were asked to survey the lighting level all over the plant, and design the best solution in order to get the requirement lighting value.
Rules, standards and regulations applied:
- Electrical Works: Normas IRAM, IEC, DIN, IEEE.
- ISA S5.1
- IRAM AADL
Water Injection Plant Design PTC / PTA | Tecpetrol | Chubut- Argentina
We provided detailed design, procurement and commissioning for a new water injection plant including civil, electrical, instrumentation, and piping detailed engineering as well as equipment erection procedures.
Rules, standards and regulations applied:
- IRAM
- Cirsoc
- IEC, DIN, NEC
- ISA S5.1
- SRT900/2015
Oil and Gas Separators design for El Alba Plant. | YPF SA | Manantiales Behr-Argentina
Due to the steadily increasing water percentage of the wells because of the secondary oil recovery applied in the oilfield during the late years we were asked to develop two biphasic Separators and One triphasic.
Rules, standards and regulations applied:
- ASME B31.3
- Cirsoc
- IEC, DIN, NEC
- ISA S5.1
Separators Erection‐ Grimbek II | YPF SA | El Trébol, Chubut-Argentina
The Project consisted on the design of a new biphasic separator and its erection procedures.
Rules, standards and regulations applied:
- ASME B31.3
- Cirsoc
- IEC, DIN, NEC
- ISA S5.1
Oil Battery 4 / Oil Battery 12-G Survey / Crude oil treatment plant Survey – Electronic Model. | YPF SA | El Trébol, Chubut-Argentina
We were asked to make the crude oil treatment plant electronic model in order to apply new future developments to this plant.
Rules, standards and regulations applied:
- IRAM
- ISA S5.1
- IEC, DIN, NEC
- ISA S5.1